We take a systematic approach to every loft boarding project. Here's exactly what to expect from initial contact through project completion.
Timeline: Same Day or Next Day
Our friendly advisors are ready to help and typically schedule surveys within 3-7 working days.
Timeline: 1-2 Hours on Site
Our experts provide professional recommendations tailored to your property and budget.
Timeline: instant
We provide transparent pricing and expert guidance to help you make the best decision.
Timeline: Upon Agreement
We typically complete installations within 2-4 weeks of order confirmation, subject to availability.
Timeline: 1 Week Before Installation
We'll provide clear guidance to ensure your loft is ready for installation day.
Timeline: 1-2 Days (Most Projects)
Our team works efficiently while maintaining the highest safety and quality standards.
Timeline: End of Installation Day
We ensure you're completely satisfied before we leave your property.
Timeline: Ongoing
We stand behind our work with comprehensive warranties and ongoing customer care.
1-2 Days
Depending on size and complexity. We'll provide accurate timescales during your survey.
Professional Team
We protect your home, work cleanly, and leave everything neat and tidy.
Get started today with your free no-obligation survey.
Schedule Your Free SurveyCall our friendly office staff and arrange a free no obligation quote on a date and timeframe to suit you.
Contact UsOne of our experienced manufacturer-qualified loft storage surveyors will visit and assess your loft space.
Contact UsYou can arrange to have your loft transformed into a reliable usable storage space.
Contact Us
All new build houses today have lofts that must conform to building regulations and government recommended loft insulation heights.
The LOFT-E® system has been designed to solve two problems when planning on boarding your loft for storage.
Firstly, boarding directly on top of your loft insulation is incorrect.
Squashing or having to remove the existing loft insulation should never be done.
Building above the insulation is now possible by
using a product that is designed to last a lifetime. The
LOFT-E® system can not only raise the loft floor platform above
the insulation level, but it can also account for variations in joist height.
Secondly, a problem that plastic products face in a loft are the consistent temperature changes, plastic softens during the heat of summer and therefore has the potential for the legs to buckle and the storage floor to collapse. This can also happen in the cold of winter with the legs getting so cold that they can become very brittle and can have a tendency to fracture, again leaving you with the same problem. Hence why we chose 100% recyclable steel.
There are 2 main parts to the LOFT-E® system. you can read about them here: